Awani International
  • LIVE
  • Videos
  • US-China
  • BRICS-RT
  • ASEAN
  • West Asia
  • Shows
  • Podcast
  • BM
    EN
  • LIVE
  • Login
  • BM
    EN
  • LIVE
  • Login
Awani International
  • LIVE
  • Videos
  • US-China
  • BRICS-RT
  • ASEAN
  • West Asia
  • Shows
  • Podcast
Europe won't be 'blackmailed' by Trump tariffs, says Danish PM
Trump tells Norway he no longer feels obligation to think only of peace
Japan PM Takaichi calls Feb 8 election seeking mandate for spending plans, defence build-up
  • PRIVACY POLICY
  • TERMS OF USE
  • ADVERTISE WITH US
  • INVESTOR

Astro AWANI | Copyright © 2025 Measat Broadcast Network Systems Sdn Bhd 199201008561 (240064-A)

Kelana Jaya LRT expected to resume operations earlier than scheduled - PM

Bernama
Bernama
13/11/2022
06:14 MYT
Kelana Jaya LRT expected to resume operations earlier than scheduled - PM
Prime Minister Datuk Seri Ismail Sabri Yaakob today said the Kelana Jaya light rail transit (LRT) line is expected to resume operations earlier than originally scheduled, on Nov 15. - BERNAMA
BERA: Prime Minister Datuk Seri Ismail Sabri Yaakob today said the Kelana Jaya light rail transit (LRT) line is expected to resume operations earlier than originally scheduled, on Nov 15.
He said thus far, all safety systems and automatic train control (ATC) systems are stable, based on test data conducted using 38 train sets along the Gombak-Putra Heights route.
"The signal and communication system is being tested, and will be tested again tonight, to ensure that the LRT is ready to resume operations safely, earlier than Nov 15," he said at a press conference after attending a programme with residents in Kampung Batu Papan here today.
Ismail Sabri said the Ministry of Transport has been instructed to conduct a comprehensive investigation to identify the cause of the incident, through the establishment of a special committee.
He said it was the second time such an incident had occurred while he was the Prime Minister, and he did not want the same thing to recur because it inconvenienced public transport users.
"We will do a thorough investigation. We do not want this to recur because it burdens the people," he said.
Previously, Prasarana Malaysia Berhad (Prasarana) announced that the LRT service between Kelana Jaya and Ampang Park stations would be suspended for seven days, from Nov 9 to 15, following the service being found to be unstable.
The temporary suspension was announced after taking into account passenger safety factors as well as the time taken to identify the cause of the service disruption.
The Kelana Jaya Line LRT service now only operates from Gombak Station to Damai Station and from Lembah Subang Station to Putra Heights Station.
-- BERNAMA
Related Topics
#ismail sabri yaakob
#Kelana Jaya
#LRT line
#to resume
#Operations
#earlier
#English News
Must-Watch Video
Stay updated with our news