NASA's Orion capsule barreled through Earth's atmosphere and splashed down in the Pacific ocean on Sunday after making an uncrewed voyage around the moon, winding up the inaugural mission of the U.S. agency's new Artemis lunar program 50 years to the day after Apollo's final moon landing.
The gumdrop-shaped Orion capsule, carrying a simulated crew of three mannequins wired with sensors, plunked down in the ocean at 9:40 a.m. PST (1740 GMT) off Mexico's Baja California peninsula, demonstrating a high-stakes homecoming before NASA flies its first crew of Artemis astronauts around the moon in the next few years.
"This was a challenging mission, and this is what mission success looks like," NASA's Artemis I mission manager Mike Sarafin told reporters after splashdown, adding that his team didn't immediately notice any issues with Orion's return from space.
A U.S. military helicopter and a group of fast boats approached the capsule after splashdown for about five hours of inspections before Orion is hoisted aboard a U.S. Naval vessel for a trip to San Diego, California.
The splashdown capped a 25-day mission less than a week after passing about 79 miles (127 km) above the moon in a lunar fly-by, and came about two weeks after reaching its farthest point in space, nearly 270,000 miles (434,500 km) from Earth.
Roughly 30 minutes before splashing down, the capsule committed to a fiery, 20-minute plunge into Earth's atmosphere when it shedded its service module in space, exposing a heatshield that reached peak temperatures of nearly 5,000 degrees Fahrenheit (2,760 degrees Celsius) during its blazing-fast descent.
Atmospheric friction slowed the capsule from 24,500 miles per hour (39,400 kph) to 325 mph, followed by two sets of parachutes that helped brake its speed to an expected 20 mph at splashdown. The capsule showed a "perfect" descent rate, Navias said.
The capsule blasted off on Nov. 16 from the Kennedy Space Center at Cape Canaveral, Florida, atop NASA's towering next-generation Space Launch System (SLS), now the world's most powerful rocket and the biggest NASA has built since the Saturn V of the Apollo era.
The debut SLS-Orion voyage kicked off Apollo's successor program, Artemis, aimed at returning astronauts to the lunar surface this decade and establishing a sustainable base there as a stepping stone to future human exploration of Mars.
Mission engineers will spend months examining data from the Artemis I mission. A crewed Artemis II flight around the moon and back could come as early as 2024, followed within a few more years by the program's first lunar landing of astronauts, one of them a woman, with Artemis III.
NASA expects to name its crew of astronauts for the Artemis II mission in early 2023, NASA's Johnson Space Center director Vanessa Wyche told reporters.
Though Orion encountered some unexpected communication blackouts and an electrical issue during its voyage around the moon, NASA has given high marks to the performance of both SLS and Orion so far, boasting that they exceeded the U.S. space agency's expectations.
"This has been an extraordinarily successful mission," NASA administrator Bill Nelson told reporters.
By coincidence, the return to Earth of Artemis I unfolded on the 50th anniversary of the Apollo 17 moon landing of Gene Cernan and Harrison Schmitt on Dec. 11, 1972. They were the last of 12 NASA astronauts to walk on the moon during a total of six Apollo missions starting in 1969.
The Artemis program, named after the twin sister of Apollo, marks a major turning point for NASA, redirecting its human spaceflight program beyond low-Earth orbit after decades focused on space shuttles and the ISS.
NASA considered re-entry the single most critical phase of Orion's journey, testing whether its newly designed heat shield can withstand atmospheric friction and safely protect astronauts that would be on board.
"It is our priority-one objective," Sarafin said at a briefing last week. "There is no arc-jet or aerothermal facility here on Earth capable of replicating hypersonic re-entry with a heat shield of this size."
NASA officials have stressed the experimental nature of the Artemis I mission, marking the first launch of the Boeing Co-built BA.N SLS and the first combined with Orion, which previously flew a brief two-orbit test launched on a smaller Delta IV rocket in 2014. The capsule was built by Lockheed MartinLMT.N.
Compared with Apollo, born of the Cold War-era U.S.-Soviet space race, Artemis is more science driven and broad-based, enlisting other countries and commercial partners such as Elon Musk's SpaceX and the space agencies of Europe, Canada, and Japan.
Orion's European Space Agency-supplied service module, a housing for its propulsion system that was jettisoned before the capsule's descent into Earth's atmosphere, "performed beautifully," ESA’s mission manager Philippe Deloo said in a statement.
"This is a great day not only for America, but it's a great day for all of our international partners - that's the difference from 50 years ago," Nelson said.
Reuters
Mon Dec 12 2022
US Navy divers attach winch cables to NASA's Orion capsule after being successfully secured by a NASA and US Navy team, off the coast of Baja California, Mexico, 11 December 2022. - REUTERS
ISIS Malaysia's perspective of Budget 2025
An excellent rakyat-centric budget under the overarching principle of a caring and humane economy.
Budget 2025: Record increase in STR, SARA aid initiatives
The government will provide a significant boost to the Sumbangan Tunai Rahmah (STR) and Sumbangan Asas Rahmah (SARA) initiatives next year.
Budget 2025: EPF contributions to be made mandatory for foreign workers – PM Anwar
The government plans to make it compulsory for all non-citizen workers to contribute to the Employees Provident Fund (EPF).
What policies to expect from Indonesia's new President Prabowo
Prabowo will be open to foreign investment, his aide has said, such as by offering investors management of airports and sea ports.
Budget 2025: Govt allocates RM470 mil to empower women's participation in PMKS
The Women's Leadership Apprenticeship Program will be intensified as an effort to produce more female corporate personalities.
Israel sends more troops into north Gaza, deepens raid
Residents of Jabalia in northern Gaza said Israeli tanks had reached the heart of the camp, using heavy air and ground fire.
Indonesia ramps up security ahead of Prabowo's inauguration
Prabowo Subianto will be sworn in as Indonesia's president on Sunday with Vice President-elect, Gibran Rakabuming Raka, also taking office.
Immediate allocation of RM150 mil for local authorities, DID to tackle flash floods
Datuk Seri Anwar Ibrahim said this allocation is intended to address the recent flash floods that hit the capital and several major towns.
Budget 2025: Sabah, Sarawak to continue receiving among highest allocations - PM
Sabah and Sarawak continues to be prioritised under Budget 2025, with allocations of RM6.7 billion and RM5.9 billion respectively.
NFOF will be operational in November 2024 with funding of RM1 bil
PM Anwar Ibrahim said NFOF will support venture capital fund managers to invest in startup companies with RM300 million set aside for 2025.
Minimum wage to increase to RM1,700 effective Feb 1, 2025
The Progressive Wage Policy would be fully enforced next year with an allocation of RM200 million, benefiting 50,000 workers.
Bursa Malaysia ends higher on Budget 2025 optimism
The benchmark index, which opened 1.85 points higher at 1,643.29, moved between 1,641.71 and 1,649.31 throughout the trading session.
Five important aspects relating to people’s lives in Budget 2025 - PM
The focus is on driving the MADANI Economy, speeding reforms, cutting red tape, raising wages, and tackling the cost of living.
Economic outlook: Govt plans to leverage, expand existing city transit system
The expansion aims to provide a more efficient and reliable public transportation network, reduce congestion, and improve accessibility.
Economic outlook: Budget 2025 to lay foundation for a digital-driven economy
The report said Budget 2025 will entail efforts to position Kuala Lumpur as a top 20 global startup hub by 2030 through the KL20 initiative.
Economic outlook: Corruption and lack of accountability hinder economic progress
Special Cabinet Committee on National governance is established to curb corruption, law reforms to modernise outdate regulations, MoF said.
National Wages Consultative Council will be strengthened
The govt will also incentivise hiring women returning from career breaks, offer job matching and improve care services facilities.
Economic outlook: Ensuring 11 years of compulsory education for all children
Budget 2025 will continue prioritising upskilling and retraining initiatives to equip workers with the latest skill sets necessary.
Consolidated public sector projected to record lower surplus of RM41.7 bil 2024
The MoF said the consolidated general government revenue is estimated to increase slightly to RM384.7 billion in 2024.
PM announces substantial Budget 2025 hastening Malaysia to become Asian economic powerhouse
Datuk Seri Anwar Ibrahim said it would create jobs and also tackle financial leakages to enhance public spending efficiency.