Awani International
  • LIVE
  • Videos
  • US-China
  • BRICS-RT
  • ASEAN
  • West Asia
  • Shows
  • Podcast
  • BM
    EN
  • LIVE
  • Login
  • BM
    EN
  • LIVE
  • Login
Awani International
  • LIVE
  • Videos
  • US-China
  • BRICS-RT
  • ASEAN
  • West Asia
  • Shows
  • Podcast
Europe won't be 'blackmailed' by Trump tariffs, says Danish PM
Trump tells Norway he no longer feels obligation to think only of peace
Japan PM Takaichi calls Feb 8 election seeking mandate for spending plans, defence build-up
  • PRIVACY POLICY
  • TERMS OF USE
  • ADVERTISE WITH US
  • INVESTOR

Astro AWANI | Copyright © 2025 Measat Broadcast Network Systems Sdn Bhd 199201008561 (240064-A)

KLK mudslide: Cleanup in motion, highway remains closed

Harits Asyraf Hasnan
Harits Asyraf Hasnan
12/11/2015
04:34 MYT
KLK mudslide: Cleanup in motion, highway remains closed
Astro AWANI was informed that cleaning work would take two days to complete.
The Kuala Lumpur Karak (KLK) Highway remained closed to traffic for cleaning work, following the mudslide on Wednesday evening.
Several bulldozers of expressway concessionaire, Anih Berhad began cleaning since 9.30am today.
Vehicles which are currently on the East-Coast Highway can make a U-turn to return to their original location.
Astro AWANI was informed that cleaning work would take two days to complete.
Following the information users are advised to use alternative routes as informed by the Malaysian Highway Authority (LLM).
READ: Kuala Lumpur-Karak Highway remains closed to traffic
READ: Four vehicles trapped under KL-Karak highway mudslide unearthed
READ: Mudslide eyewitness: 'I saw water gushing, cars were almost adrift'
READ: "It was like being in a tsunami of mudslide" - Mudslide survivor
PHOTO: Kuala Lumpur-Karak highway mudslide
Meanwhile, according to a report by Bernama, cleaning work in the mudslide area at Km 52.4 Kuala Lumpur-Karak Expressway was completed at 3.20 am this morning.
The expressway concessionaire, Anih Berhad in a statement however said the routes will remain closed until further notice.
It added that only vehicles stranded between Selesa Hillhomes and Bentong Plaza are permitted through the expressway.
A landslide occurred at KM52.4 of the Kuala Lumpur-Karak Highway near Bukit Tinggi on Wednesday evening.
According to the Malaysian Highway Authority's official Twitter (@LLMinfotrafik), both north- and south-bound roads have been closed and traffic was at a stand at the time the incident occurred.
Related Topics
#bulldozers
#cleaning up
#Kuala Lumpur-Karak Highway
#Malaysia Highway Authorities
Must-Watch Video
Stay updated with our news